This entry was posted on Monday, June 11th, 2007 at 3:24 pm and is filed under My Pictures & Movies, Fangirl & Nerdy Stuff, Filmmaking. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.
- Cinema & Literature (19)
- Fangirl & Nerdy Stuff (86)
- Festivals & Events (54)
- Film Fatale (4)
- Filmmaking (142)
- Miscellany (1)
- My Pictures & Movies (83)
- Personal and misc. (115)
- Press and awards (19)
- Twitter mini-blog (1143)
- Xanga/MySpace Archive (127)
./shutdown Production Diary #3
So this weekend we shot our big opening sequence. I’d say the crew worked about 27 hours of production over two days. Many thanks to all 15 or so background actors and at least a dozen crew who showed up for our big Saturday shoot! We were even blessed with a celebrity guest cameo for our exciting opening sequence to episode 1. Can’t wait to share the trailer with you all very soon!
Michelle’s Basket O’ Production Stills.
Peace out, for now. Remember to visit the ./shutdown official site.
Leave a Reply

